Contech Engineered Solutions: The Bid Was Designed to Lose

Whistleblower Justice Network

Contech Engineered Solutions pleaded guilty over coordinated bids to the North Carolina Department of Transportation, according to the Fourth Circuit’s account of the criminal case. The manufacturer submitted deliberately higher bids to help its distributor win aluminum-structure projects, then supplied the aluminum. Losing the government contract still brought Contech business. If you price materials, prepare bids or work with dealers, the question at the center of this case will sound familiar: whose number actually set the price?

The bid-rigging case concerned NCDOT purchases. The court’s account describes Contech as a manufacturer of corrugated steel and aluminum pipe and plate, and Pomona Pipe Products as its distributor and exclusive North Carolina dealer. Their business relationship explains both why they exchanged prices and why a bid designed to lose could be valuable.

A Manufacturer and Its Dealer on the Same Bid Sheet

Contech and Pomona each supplied something the other needed for the state’s aluminum-structure projects. The Fourth Circuit described projects across North Carolina that installed aluminum structures to prevent flooding. Contech supplied the aluminum; Pomona supplied the services.

When Pomona won, it performed the work using Contech’s aluminum. When Contech won, Pomona provided the necessary services. The court noted that Contech’s aluminum accounted for around 75% of Pomona’s bid. Either company’s award could generate business for both.

That relationship required pricing conversations. Contech needed to know what Pomona would charge for services, and Pomona needed Contech’s aluminum price.

The court’s criminal-case account identifies a different request after a sales manager took charge of Contech’s bids to the department in 2009. He wanted Pomona’s total bid price. The manager, or another Contech employee acting at his direction, obtained that number and added a small percentage to produce Contech’s bid.

The distributor’s finished price had become the starting point for its supposed competitor’s offer. We call that a contest with the finishing order already arranged. Some competition.

What Is a False Certification?

A false certification misstates something the buyer is being asked to rely on. In the Contech criminal case, the representation concerned competition: both companies certified that their bids were “submitted competitively and without collusion.”

The court’s account of the indictment says the government charged Contech and its executive with misleading the state through intentionally losing bids and false certifications. The alleged deception joined the pricing arrangement to the statement sent with the bid. The indictment alleged that Contech presented itself as Pomona’s competitor while arranging a higher offer and benefiting from Pomona’s purchases of its aluminum.

The opinion also describes testimony at the executive’s trial establishing the intentionally losing bids, efforts to conceal the scheme and certifications of competition. Those details give the certification its significance. The form promised a contest; the bid calculation had been built to produce a particular ordering of the offers.

Why Contech Wanted Its Own Bid to Lose

The deliberately higher bids helped Pomona win while preserving Contech’s aluminum sales. The Fourth Circuit’s account identifies only three consistent bidders: Contech, Pomona and Lane Enterprises. Lane’s bids were nearly always higher than the other companies’ bids, so placing Contech above Pomona generally left the distributor in front.

The court described other benefits the manager saw in keeping Contech in the bidding. Submitting bids kept the company on the department’s emergency bid list for possible additional aluminum supply business. Contech’s offer also served as a backup if Pomona’s bid failed for a technical reason. The manufacturer could support its dealer and keep a route to the award for itself.

The same account describes how the manager concealed the arrangement. He deleted conversations, preferred phone calls to digital records and varied the percentage added to Pomona’s price to avoid drawing the state’s attention. A repeating gap was something he was trying to hide.

That gives the losing bid a job of its own. It preserved the appearance of another offer while protecting the intended winner. The buyer saw another price. Contech saw another way to sell aluminum.

What Are the Red Flags of Bid Rigging?

The red flags of bid rigging in the Contech case were conversations about another bidder’s total, deliberately higher offers, attempts to conceal the exchange and certifications contradicted by the bid preparation. For someone inside the business, the revealing record may be the instruction that explains why a number changed.

Scholarship helps explain why willingness to win matters. Collusion Detection in Procurement Auctions, a 2013 Higher School of Economics working paper, studied highway-construction procurement in a Russian region. It found passive bidding consistent with rotation among suppliers. In the high-price auctions it studied, bidding did not respond to factors such as available capacity and cost advantages from experience:

Regardless of how much a contractor is ready to fulfill the contract, he does not bid aggressively or does not submit any bids at all.

Collusion Detection in Procurement Auctions, Higher School of Economics, 2013

The question it raises here is whether a bidder is trying to win. Contech’s criminal-case account supplies the answer for its own bids: the manager used Pomona’s price to make Contech lose. An employee who knows how the estimate was prepared can explain something a published bid total leaves hidden.

The Records Behind the Price

The strongest account connects the bid the state received with the communications that produced it and the supply relationship that made losing worthwhile. We examine the bid and payment records together, because the award identifies the successful bidder while supplier records can show who else earned business from the project.

We connect estimating records to the submitted price, pricing messages to the certification, and purchase orders and invoices to the losing bidder’s supply business. Together, they can show how the bid was set and why losing still paid.

A construction study reaches beyond the bid totals for the same reason. Review of Collusion and Bid Rigging Detection Methods in the Construction Industry, published in the Creative Construction Conference proceedings in 2018, proposed bringing together bidder ownership and subcontracting relationships, tender prices and winners, and quantities and materials. It treated those connections as information that could help detect collusion.

Applied to Contech’s arrangement, the practical question is who could explain the link between the higher bid and the continuing aluminum sales. The estimating employee sees the calculation. The sales employee sees the dealer relationship. The purchasing or accounts employee may see the supply transaction. We work with the person who holds that knowledge to connect it to the government’s purchase.

The Corporate Resolution for Coordinated NCDOT Bids

The corporate resolution was Contech’s guilty plea to an antitrust charge and a fraud-conspiracy charge, as the Fourth Circuit recorded. The opinion identifies the FBI and the Department of Justice’s Antitrust Division as the investigators.

The court also describes Contech’s defense of the arrangement: its direct bid avoided undercutting its dealer’s price. Contech pointed to the fact that it and its distributor both offered the manufacturer’s products. That framing puts the dealer relationship first. We keep the buyer’s promised competition in view: the bid certifications said the offers were competitive while the manager used the dealer’s total to set a higher price.

On the executive’s appeal, the court reversed his antitrust conviction but left his fraud convictions standing. The fraud evidence concerned the false bid certifications and the deliberately higher bids.

What Your Bid Knowledge Can Reveal

For a civil government procurement whistleblower case, we examine how the false representation connects to the government’s money. That includes the bid, the award and the payments it produced, along with who knew how the price had been set. Your knowledge of the calculation or supplier relationship may supply the connection between records that look unrelated from outside the company.

For state purchases, the federal False Claims Act route requires a connection to federal money or claims. A whistleblower case under the False Claims Act can pay 15% to 30% of what the government recovers. We assess the civil case your information can support, including the connection between the pricing decision and the government payments.

You Know Where the Bid Number Came From

If another bidder’s total became the starting point for your company’s offer, speak with our whistleblower experts about how your company’s bid was set. We build your strongest government procurement fraud whistleblower case around the pricing decisions, the certifications and the business behind the bids. We bring in government procurement fraud whistleblower lawyers who know bidding and supply arrangements, and stay beside you throughout the case.

WHISTLEBLOWER JUSTICE NETWORK CAN HELP YOU
Make a difference.
Whistleblower Justice NetworkReport Fraud
100% CONFIDENTIALFREE CONSULTATION24 / 7 / 365